Project Main Component:Supply and install the following systems:
Electrical Works: Panel Boards, UPS System, Low Voltage Cables, Cable Trays, Lighting, Lighting Switches, Power, Sockets And Earthing.
Light Current Works: Fire Alarm System, Intrusion System, Access Control System, Sound System, Queuing System, IP-CCTV System, Structured Cabling System, TV System And Early Alarm System.
Fire Fighting Works: Fire search, CO2 System And FM 200 System.